Development of an Innovative Formwork System for Casting Reinforced Concrete Beams
Volume 1, Issue 1 WON HYUN CHO1, CHAEYEON LIM2, SUNKUK KIM3, SEONGSEOK GO
Published online: 21 June 2015
Article Views: 53
Abstract
This study aims to propose a formwork system for beams that can improve constructability and economic feasibility. There are several problems related to the structure, quality, duration, and cost of construction. In this regard, the study proposes the Formwork System for the Beams to improve the existing formwork problems and conduct it with more accuracy and shorter duration. However, no analysis on productivity as the system is applied on site is made for this study. The existing formwork requires a lot of time and effort when installing the joist and purlin. Moreover, a gap in load support arising from removing the joist and purlin may lead to cracks in concrete beams or declined compressive strength. Forms are produced according to the dimensions of beams onsite, so the quality and use of forms decrease. Therefore, further studies on analyzing the productivity resulting from the actual application of the Formwork System should be conducted.
Reference
Y. S. Jung, J. H. Park, S. H. Kang, B. M. Park and I. S. Choi, “Factors for selecting forms; A case-study,” in Proc. of the Annu. Conf. of the Korea Inst. of Building Construction, vol. 5, no. 2, pp. 111-116, 2005.
J. B. An, “A study on the performance evaluation of form using the aluminum alloy frame reinforced,” Journal of the Korea Institute of Building Construction, vol. 1, no. 1, pp.135-142, 2001.
C. Lim and S. Kim, “Basic study of reuse planning automation algorithms on system forms that are used on girders and beams,” in Proc. of the Annu. Conf. of the Korea Inst. of Building Construction, vol. 15, no. 1, pp. 7-8, 2015.
T. Kim, C. Lim and S. Kim, “Requirement analysis for development of smart beam form,” in Proceeding of the Annu. Conf. of the Korea Inst. of Building Construction, vol, 14, no. 1, pp. 70-71, 2014.
H. C. Kim, “Research on system form method construction case in the apartment housing project,” The Dep. of Architectural Eng., Yeungnam Univ, Gyeongsan, South Korea, 2009.
H. W. Shin, G. H. Kim, J. Y. Kim and H. K. Cho, “A research on a comparison between the strength and weakness of each formwork methods in the core wall construction,” Journal of the Korea Institute of Building Construction, vol. 7, no. 4, pp. 153-159, 2007.
K. M. Hyun, I. W. Choi and O. K. Kim, “Development of the form-work system for quality improvement on the kick-up of wall in the apartment house construction,” Journal of Architectural Institute of Korea, vol. 21, no. 4, pp. 173-178, 2005.
D. W. Kim, S. W. Park, H. S. Lee and M. S. Park, “A framework system for reducing the construction duration of the wall systems buildings,” in Proc. of Annu. Conf. of Architectural Inst. of Korea, vol. 25, no. 1, pp. 205-208, 2005.
Y. S. Park, H. R. Kim, K. Y. Nam, S. S. Lee, K. I. Kim and H. S. Kim, “Development of fabricated form panel considering wall height variation,” in Proc. of the Annu. Conf. Architectural Inst. of Korea, vol. 28, no. 1, pp. 129-133.
M. K. Hurd, “Formwork for Concrete,” Amer. Concrete Inst., 2005.
Y. K. Chi, “A study of hindrance factor and improvement of large-sized system form work in an apartment building construction,” M.S. thesis, Dept. of Constr. Manage., Hanyang Univ., Seoul, South Korea, 2008.
To Cite this article
W. H. Cho, C. Lim, S. Kim, S. Go, “Development of an innovative formwork system for casting reinforced concrete beams,” International Journal of Technology and Engineering Studies, Vol. 1, no. 1, pp. 14-18, 2015.